{"id":1022,"date":"2022-10-07T15:10:15","date_gmt":"2022-10-07T19:10:15","guid":{"rendered":"https:\/\/blog.savethespeedway.net\/?p=1022"},"modified":"2022-10-07T15:10:17","modified_gmt":"2022-10-07T19:10:17","slug":"north-wilkesboro-speedway-advertisement-for-bids-materials-and-construction","status":"publish","type":"post","link":"https:\/\/blog.savethespeedway.net\/index.php\/2022\/10\/07\/north-wilkesboro-speedway-advertisement-for-bids-materials-and-construction\/","title":{"rendered":"North Wilkesboro Speedway &#8211; ADVERTISEMENT FOR BIDS &#8211; Materials and Construction"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>ADVERTISEMENT FOR<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>REQUALIFICATION<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CHOATE CONSTRUCTION COMPANY<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>NOTICE TO CONTRACTORS:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">North Wilkesboro Speedway Project<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">North Wilkesboro,<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">North Carolina<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>BIDDER PRE-QUALIFICATION REQUEST:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Choate Construction Company has been selected as the Design Builder by Wilkes County and is seeking to pre-qualify construction trade and specialty contractors to submit bids for furnishing labor, materials, equipment and tools for the North Wilkesboro Speedway Project in North Wilkesboro, North Carolina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>PROJECT DESCRIPTION:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The County of Wilkes intends to make significant improvements to the overall facilities and amenities of the North Wilkesboro Speedway, located at 381 Speedway Ln., North Wilkesboro, NC 28659. With the aid and expertise of Speedway Motorsports, Wilkes County plans to create a new, signature look for the overall complex that embraces the nostalgia of the historic North Wilkesboro Speedway. Creating a structure and facility that can simultaneously embrace the racing heritage of the track and accommodate a multitude of different large-scale events is of paramount importance for the County of Wilkes and Speedway Motorsports. The scope of work includes some site development, fencing, concrete, masonry, structural steel, rough carpentry, casework, waterproofing, siding &amp; roofing, joint sealants, doors and hardware, aluminum storefront, non-structural metal framing, drywall, tiling, ACT, soft flooring, painting, division 10 accessories, fire suppression, plumbing, HVAC, electrical systems, sports track lighting.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>TENTITIVE BID PACKAGES:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0174 \u2013 Final Cleaning<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0301 \u2013 Turnkey Concrete<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0302 \u2013 Safer Wall (Concrete)<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0303 \u2013 Concrete Track Wall Repairs<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0422 \u2013 Turnkey Masonry<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0512 \u2013 Turnkey Structural &amp; Miscellaneous Steel<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0611 \u2013 Rough &amp; Framing Carpentry<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0641 \u2013 Finish Carpentry &amp; Casework<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0742 \u2013 Siding<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0750 \u2013 Roofing<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0792 \u2013 Caulking &amp; Waterproofing<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0800 \u2013 Doors, Frames, Hardware, Installation<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0833 \u2013 Overhead Doors<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0840 \u2013 Glass &amp; Glazing<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0920 \u2013 Metal Studs, Drywall, ACT<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0930 \u2013 Hard Flooring<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0960 \u2013 Soft Flooring<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP0991 \u2013 Painting<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP1014 \u2013 Signage<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP1028 \u2013 Toilet Accessories<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP2205 \u2013 Plumbing Systems Design-Build Package<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP2305 \u2013 Mechanical Systems Design-Build Package<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP2605 \u2013 Electrical Systems Design-Build Package<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP2656 \u2013 Track &amp; Site Lighting Design-Build Package<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP3122 \u2013 Site Development<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP3290 \u2013 Landscaping<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 BP3231 \u2013 Fencing &amp; Security<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Additional Packages may be added and\/or deleted at the discretion of the Design Builder. Historically underutilized business participation is encouraged.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PREQUALFICATION FORMS CAN BE OBTAINED from Choate Construction from jenny arias at <a href=\"mailto:jarias@choateco.com\">jarias@choateco.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>PRE-QUALIFICATION CUTOFF DATE IS Wednesday October 12, 2022<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>by 5:00 PM<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Interested contractors shall submit their completed prequalification submittals to:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jenny Arias<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Choate Construction<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Company<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2907 Providence Road<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suite 400<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Charlotte, North Carolina 28211<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Phone: (704) 556-0550<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Fax: (704) 556-0601<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">OR via E-mail at <a href=\"mailto:jarias@choateco.com\">jarias@choateco.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>PLEASE NOTE:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Only Pre-Qualified contractors will receive bidding documents and be allowed the opportunity to bid on this project. If you should have any questions or comments please contact the Choate Construction representative listed above.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ADVERTISEMENT FOR REQUALIFICATION CHOATE CONSTRUCTION COMPANY NOTICE TO CONTRACTORS: North Wilkesboro Speedway Project North Wilkesboro, North Carolina BIDDER PRE-QUALIFICATION REQUEST: Choate Construction Company has<\/p>\n","protected":false},"author":1,"featured_media":822,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[217],"tags":[],"class_list":["post-1022","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news"],"_links":{"self":[{"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/posts\/1022","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/comments?post=1022"}],"version-history":[{"count":1,"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/posts\/1022\/revisions"}],"predecessor-version":[{"id":1023,"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/posts\/1022\/revisions\/1023"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/media\/822"}],"wp:attachment":[{"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/media?parent=1022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/categories?post=1022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.savethespeedway.net\/index.php\/wp-json\/wp\/v2\/tags?post=1022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}